- Ville de Montréal. Section des archives
- Fonds Biodôme de Montréal. - [196-]-
- Photographies. - [196-]-1993
- Construction du Biodôme de Montréal. - 1967-1993, surtout 1990-1992
- Chantier du Biodôme, pose des vitres des bassins. - 31 juillet 1991 - 13 août 1991.
- VM168-Y-3_10-065
VM168-Y-3_10-065
item
This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM168-Y-3_10-065.

Where
Not on the map yet.
- Held by
- Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
- Level
- item
- Location
No place found in this description yet.
- Format
- Photograph
- What the image shows
- A colour photograph of a large building site with concrete walls, steel frames and scaffolding, looking across the interior of a structure under construction. In the foreground, workers in blue overalls and white and red hard hats stand among large curved concrete forms, with a yellow hoist arm lifting a panel on the right. White plastic sheeting hangs over part of the framework on the left, and the watermark reads 'Archives de la Ville de Montréal'.Described automatically by a vision model; may contain mistakes.
- In the picture
- Building MaterialConcrete StructureConstructionConstruction SiteConstruction WorkerCraneEngineeringExterior ViewHard HatMuseumScaffoldingSteel StructureWorkshopTagged automatically by a vision model; may contain mistakes.
- Harvested
- 2026-10-16T15:47:47Z · source datestamp n/a · ead
Digital objects at the source
- imageOpen original at source ↗VM168-Y-3_10-065.jpg