- Ville de Montréal. Section des archives
- Fonds Biodôme de Montréal. - [196-]-
- Photographies. - [196-]-1993
- Construction du Biodôme de Montréal. - 1967-1993, surtout 1990-1992
- Chantier du Biodôme, pose des vitres des bassins. - 31 juillet 1991 - 13 août 1991.
- VM168-Y-3_10-062
VM168-Y-3_10-062
item
This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM168-Y-3_10-062.

Where
Not on the map yet.
- Held by
- Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
- Level
- item
- Location
No place found in this description yet.
- Format
- Photograph
- What the image shows
- A colour photograph of a large curved wall built from plywood panels, held in place by strips of white tape and wooden supports, standing inside a hall with a glazed, arched roof. Scaffolding, a yellow hydraulic unit and scattered wood offcuts lie on the concrete floor in the foreground, and a stair and a rock-like structure are visible at the left. A date stamp in orange digits and the watermark 'Archives de la Ville de Montréal' appear in the lower corners.Described automatically by a vision model; may contain mistakes.
- In the picture
- Building MaterialConstructionConstruction SiteGlass RoofInterior ViewScaffoldingSteel StructureWood FrameTagged automatically by a vision model; may contain mistakes.
- Text in the image
- 9 4 8 994 08 9Read automatically; may contain mistakes.
- Harvested
- 2026-10-16T15:47:47Z · source datestamp n/a · ead
Digital objects at the source
- imageOpen original at source ↗VM168-Y-3_10-062.jpg