Waterfront viaduct photographs

subseries1925-1934Fonds 200 > Series 372 > Subseries 79

661 of 661 descriptions below digitizedOpen enclosing description at source ↗

This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for Fonds 200 > Series 372 > Subseries 79.

Where

Not on the map yet.

Held by
City of Toronto Archives via City of Toronto Archives
Dates
1925-1934 (indexed as 1925–1934)
Level
subseries
Extent
638 photographs : b&w ; 13 x 18 cm and smaller; 533 photographs : b&w negatives ; 13 x 18 cm and smaller
Scope & content
Subseries consists of images detailing the construction of the elevated railway viaduct along Toronto's downtown waterfront. The viaduct was designed to eliminate the railway grade crossing for major roads and a new Union Station for passenger traffic. The City, Toronto Harbour Commissioners, Grand Trunk Railway and Canadian Pacific Railway had their final design proposal approved by the Board of Railway Commissioners on July 1913. While the focus of the photographs is the road underpasses, they also document the extensive changes in railway infrastructure. Union Station, the architectural centrepiece for this engineering work, was also photographed extensively during construction.In addition, these images capture the transformation of the waterfront that occurred at the same time. Many buildings, such as the old Toronto Electric Light Company steam powered generating station, were torn down to make way for the new elevated trackwork. Approximately 2.7 million cubic meters of earth was moved to increase the track's elevation, coming from borrow pits in Leaside and Scarborough. Also included in this project were underpasses on Eastern, Logan, Greenwood, Coxwell, and Woodbine to eliminate level crossings. Construction began June 1925 and was completed on January 1931.
Location

No place found in this description yet.

Subjects
Toronto (Ont.). Dept. of Works; Union Station (Toronto, Ont., 1927-); WATERFRONTS; RAILWAYS; ROADS; BRIDGES; CONSTRUCTION