- Ville de Montréal. Section des archives
- Fonds Biodôme de Montréal. - [196-]-
- Photographies. - [196-]-1993
- Construction du Biodôme de Montréal. - 1967-1993, surtout 1990-1992
- Travaux de construction du Biodôme de Montréal. - [1991-1992].
- VM168-Y-3_29-023
VM168-Y-3_29-023
item
This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM168-Y-3_29-023.

Where
Not on the map yet.
- Held by
- Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
- Level
- item
- Location
No place found in this description yet.
- What the image shows
- A color photograph of an interior construction site, showing a large concrete structure partly wrapped in a dense tangle of wire mesh and netting. Rust-red steel scaffolding frames and diagonal braces stand against the pale concrete walls, with a white plastic-covered pile and some pipes and a stacked tank at the lower left. The large vaulted hall behind suggests a major building under construction, and a faint watermark in the lower right corner reads archives de la Ville de Montréal.Described automatically by a vision model; may contain mistakes.
- In the picture
- Building MaterialConcrete StructureConstructionConstruction SiteFormworkInterior ViewRebarScaffoldingSteel StructureWire MeshTagged automatically by a vision model; may contain mistakes.
- Harvested
- 2026-10-16T15:47:47Z · source datestamp n/a · ead
Digital objects at the source
- imageOpen original at source ↗VM168-Y-3_29-023.jpg