panarchive
  1. Ville de Montréal. Section des archives
  2. Fonds Biodôme de Montréal. - [196-]-
  3. Photographies. - [196-]-1993
  4. Construction du Biodôme de Montréal. - 1967-1993, surtout 1990-1992
  5. Ensemble du chantier des habitats. - [1990 - 1992].
  6. VM168-Y-3_25-028

VM168-Y-3_25-028

item

This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM168-Y-3_25-028.

VM168-Y-3_25-028
Ville de Montréal. Section des archives · displayed from the archive's own server (archivesdemontreal.ica-atom.org) · full-size image ↗ · view and cite at source ↗

Where

Not on the map yet.

Held by
Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
Level
item
Location

No place found in this description yet.

What the image shows
A color photograph of the interior of a large domed hall with a curved, latticed glass roof and white ribbed structural arches. In the centre, a large rocky artificial landscape under construction is shrouded in plastic sheeting, with workers and scaffolding visible among the rock forms and yellow safety railings in the foreground. The bare concrete floor is empty, and a mesh-covered wall runs along the back of the space.Described automatically by a vision model; may contain mistakes.
In the picture
Building MaterialConcrete StructureConstructionConstruction SiteConstruction WorkerCraneDomeExcavationExhibition HallInterior ViewRailingRock GardenScaffoldingSkylightTagged automatically by a vision model; may contain mistakes.
Harvested
2026-10-16T15:47:47Z · source datestamp n/a · ead

Digital objects at the source

Original metadata as harvested (ead)