- Ville de Montréal. Section des archives
- Fonds Biodôme de Montréal. - [196-]-
- Photographies. - [196-]-1993
- Construction du Biodôme de Montréal. - 1967-1993, surtout 1990-1992
- Chantier du Biodôme, pose des vitres des bassins. - 31 juillet 1991 - 13 août 1991.
- VM168-Y-3_10-050
VM168-Y-3_10-050
item
This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM168-Y-3_10-050.

Where
Not on the map yet.
- Held by
- Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
- Level
- item
- Location
No place found in this description yet.
- Format
- Photograph
- What the image shows
- A colour photograph of a large construction site under a curved, fabric-like roof structure, showing concrete curved walls and stepped concrete seating in the foreground. A yellow forklift with a driver stands at left beside a large wooden framework and a wooden boat-like hull lying on pallets, with a long steel beam leaning diagonally across the scene. Workers in hard hats are visible near the back, and scaffolding and tarpaulins surround the site. A partial date stamp and the watermark 'Archives de la Ville de Montréal' appear in the lower right corner.Described automatically by a vision model; may contain mistakes.
- In the picture
- ArchConcrete StructureConstructionConstruction SiteConstruction VehicleConstruction WorkerExcavationExterior ViewMachineryScaffoldingStadiumSteel StructureWood FrameTagged automatically by a vision model; may contain mistakes.
- Harvested
- 2026-10-16T15:47:47Z · source datestamp n/a · ead
Digital objects at the source
- imageOpen original at source ↗VM168-Y-3_10-050.jpg