- Ville de Montréal. Section des archives
- Fonds Aqueduc de Montréal. - 1840-2002.
- Dessins techniques et d'architecture. - 1860-1965
- General lay out of 5,000,000 gallon triplex pump & motor, Wellington street pump station / Montreal Water and Power Company . - 6 avril 1899
General lay out of 5,000,000 gallon triplex pump & motor, Wellington street pump station / Montreal Water and Power Company . - 6 avril 1899
item6 avril 1899VM117-T-P061
Description only — contact the archiveOpen enclosing description at source ↗Search source for this title ↗
This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM117-T-P061.
Where
Not on the map yet.
- Held by
- Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
- Dates
- 6 avril 1899 (indexed as 1899)
- Level
- item
- Extent
- 1 plan.
- Scope & content
- Ce plan fait parti d'un ensemble de 14 plans relatifs à la station de pompage de Sainte-Cunégonde, regroupés sous l'étiquette M-278. Anglais. Le numéro 1500 a été inscrit au pochoir dans le coin inférieur droit.
- Location
No place found in this description yet.
- Harvested
- 2026-10-20T15:32:56Z · source datestamp n/a · ead