panarchive
Élargissement du canal de l'aqueduc : excavation pour la conduite d'amenée parallèle. - 2 septembre 1908.
Ville de Montréal. Section des archives · from archivesdemontreal.ica-atom.org

Élargissement du canal de l'aqueduc : excavation pour la conduite d'amenée parallèle. - 2 septembre 1908.

1 imageVM117-Y-4-D000-P064a

This description was harvested from its parent's finding aid, but the source catalogue gave no direct link for it. The link opens the nearest enclosing description; look there for VM117-Y-4-D000-P064a.

Held by
Ville de Montréal. Section des archives via Archives de Montréal (Ville de Montréal)
Dates
2 septembre 1908 (indexed as 1908)
Level
item
Scope & content
Chantier de l'élargissement du canal de l'aqueduc. Vue vers l'est de la tranchée creusée pour installer la conduite d'amenée parallèle, à la hauteur de la station 211. On aperçoit des ouvriers travaillant au fond de la tranchée. Titre originel : # 064a - Station 211, looking east - Sept. 2, 1908
In the picture
AqueductCanalConstructionConstruction SiteConstruction WorkerExcavationExterior ViewHatHistoric SiteHistorical CostumeManMontrealOutdoor EventRailway BridgeRockScaffoldingTrenchWorkerTagged automatically by a vision model; may contain mistakes.
Location

No place found in this description yet.

Where

More details

Extent
1 épreuve photographique.
Format
Photograph
What the image shows
A black-and-white photograph looking along a deep excavated trench cut between rocky earth walls, with a timber framework and a wooden bridge-like structure visible in the distance. Several workmen in caps and work clothes stand in the trench, and a blurred, steam-like cloud rises from the left while a tall pole and cable run diagonally across the scene. An archive watermark reading Archives de la Ville de Montréal appears in the lower right corner.Described automatically by a vision model; may contain mistakes.
Harvested
2026-10-20T15:32:56Z · source datestamp n/a · ead

Digital objects at the source

Original metadata

As harvested (ead)